Spain
Valencia: Mediterranean solar, SeaMeWe cable landings
Valencia combines Mediterranean solar (1,700 kWh/kWp) and cable landings. REE PPAs €48–66/MWh.
Installed capacity
90 MW
PPA
48–66 €/MWh
PUE
1,38
Paris latency
22 ms
Highlights
- Solar 1,700 kWh/kWp
- SeaMeWe-6 landings
- Low land cost
- 22 ms latency to Madrid
Operators on site
DataCenter ValenciaAdam VLCTelefónica VLCEquinix VLC1
Nearby cities & region
- Region: IberiaIberia produces 24% of EU solar (1,700–1,900 kWh/kWp).
- 🇪🇸 MadridMadrid (MAD1–4) is exploding: Microsoft 1 GW, Meta Talavera 600 MW, AWS Aragón 2.5 GW.
- 🇪🇸 BarcelonaBarcelona hosts Equinix BA1–BA2 and lands 2Africa + MedNautilus cables.
- 🇪🇸 SevilleAndalusia produces 24% of Spanish solar.
- 🇵🇹 LisbonLisbon lands 8 Atlantic cables (Brazil, USA, Africa).
- 🇵🇹 PortoPorto leverages Atlantic wind and 2Africa/EllaLink landings.
Looking for a renewable PPA in Valencia ?
nav.waitlist →