Portugal
Porto: Atlantic wind and transatlantic cable landings
Porto leverages Atlantic wind and 2Africa/EllaLink landings. REN PPAs €55–72/MWh.
Installed capacity
55 MW
PPA
55–72 €/MWh
PUE
1,36
Paris latency
18 ms
Highlights
- 2Africa, EllaLink landings
- Atlantic wind
- Brazil/Africa hub
- 18 ms latency to Madrid
Operators on site
Altice PortugalEquinix OP1DataCenter.com PortoClaranet PT
Nearby cities & region
- Region: IberiaIberia produces 24% of EU solar (1,700–1,900 kWh/kWp).
- 🇪🇸 MadridMadrid (MAD1–4) is exploding: Microsoft 1 GW, Meta Talavera 600 MW, AWS Aragón 2.5 GW.
- 🇪🇸 BarcelonaBarcelona hosts Equinix BA1–BA2 and lands 2Africa + MedNautilus cables.
- 🇪🇸 SevilleAndalusia produces 24% of Spanish solar.
- 🇪🇸 ValenciaValencia combines Mediterranean solar (1,700 kWh/kWp) and cable landings.
- 🇵🇹 LisbonLisbon lands 8 Atlantic cables (Brazil, USA, Africa).