Spain
Madrid: €45/MWh solar PPA, the rising data center hub
Madrid (MAD1–4) is exploding: Microsoft 1 GW, Meta Talavera 600 MW, AWS Aragón 2.5 GW. Andalusian solar at €45–54/MWh — the lowest prices in Europe.
Installed capacity
340 MW
PPA
45–60 €/MWh
PUE
1,40
Paris latency
18 ms
Highlights
- 32 GW Spanish solar installed
- LATAM hub (Lisbon, Casablanca latency)
- Limited free-cooling (climate)
- 14-month permitting
Operators on site
Equinix MD1–4Digital Realty MAD10Microsoft MadridMeta TalaveraAWS Aragón
Nearby cities & region
- Region: IberiaIberia produces 24% of EU solar (1,700–1,900 kWh/kWp).
- 🇪🇸 BarcelonaBarcelona hosts Equinix BA1–BA2 and lands 2Africa + MedNautilus cables.
- 🇪🇸 SevilleAndalusia produces 24% of Spanish solar.
- 🇪🇸 ValenciaValencia combines Mediterranean solar (1,700 kWh/kWp) and cable landings.
- 🇵🇹 LisbonLisbon lands 8 Atlantic cables (Brazil, USA, Africa).
- 🇵🇹 PortoPorto leverages Atlantic wind and 2Africa/EllaLink landings.
Looking for a renewable PPA in Madrid ?
nav.waitlist →