🇬🇵
Guadeloupe (France)
Guadeloupe: EDF SEI ZNI, Bouillante geothermal and PV+storage
Guadeloupe is a Non-Interconnected Zone (ZNI) operated by EDF SEI. Mix in transition: Bouillante geothermal (15 MW), PV + Li-ion storage, fuel-oil exit targeted 2030 (PPE). Solar+storage PPAs €120–180/MWh.
Installed capacity
12 MW
PPA
120–180 €/MWh
PUE
1,55
Paris latency
95 ms
Highlights
- EDF SEI ZNI grid
- Bouillante geothermal 15 MW
- PPE 2030 fuel-oil exit
- ~95 ms latency to Paris
Operators on site
EDF SEI GuadeloupeAlbioma CaraïbeVoltalia AntillesAkuo Energy
Looking for a renewable PPA in Pointe-à-Pitre ?
nav.waitlist →