Ireland
Dublin: 21% of Irish electricity for data centers
Dublin (DUB1–DUB8) hosts Microsoft, AWS, Google, Meta, Equinix — 1.2 GW installed, 21% of national consumption. EirGrid froze connections until 2028. New projects route to Cork and Galway.
Installed capacity
1200 MW
PPA
85–110 €/MWh
PUE
1,28
Paris latency
22 ms
Highlights
- #1 EU hyperscaler hub
- 12.5% CIT attractive
- EirGrid connection freeze until 2028
- Bring Your Own Power mandatory
Operators on site
Microsoft Grange CastleAWS DUB10–18Google Profile ParkMeta CloneeEquinix DB1–6
FAQ
Can a PPA still be signed for Dublin?
Yes but via Bring Your Own Power: 100% coverage, 80% renewable. Western wind PPA €78/MWh.
Nearby cities & region
- Region: FLAP-DFLAP-D concentrates 75% of EU data center capacity (3,200 MW).
- 🇩🇪 FrankfurtWith 850 MW (FRA1–FRA13), Frankfurt is Europe's #1 data center hub thanks to DE-CIX, the world's largest IXP.
- 🇬🇧 LondonSlough (LON1–8) and East London host 920 MW.
- 🇳🇱 AmsterdamAmsterdam hosts AMS-IX (28% of European Internet traffic) and 480 MW of data centers.
- 🇫🇷 ParisParis hosts 580 MW of data centers (PA1–PA12 Equinix, Interxion, Data4) on a 92% low-carbon nuclear-renewable mix.
- 🇬🇧 SloughSlough is the UK Frankfurt: 660 MW (LD4, LD8, Equinix LD), but SSEN announced a >25 MW grid connection moratorium until 2030..
- 🇳🇱 RotterdamRotterdam combines world port, green hydrogen (Shell, BP) and Maasvlakte data centers.