Colocation data center: per-kW prices across Europe in 2026
Frankfurt, London, Amsterdam, Paris, Madrid: what does 1 kW of premium colocation really cost in 2026? Full benchmark.
2026 context
AI demand has blown up colocation pricing: +38% in 2 years across European Tier-1 hubs (FLAP-D: Frankfurt, London, Amsterdam, Paris, Dublin).
2026 premium colocation rates (€/kW/month)
| City | Setup | Recurring /kW/month | Energy €/MWh | Verdict | |---|---|---|---|---| | Dublin | €850 | €245 | 110 | Saturated, frozen | | Frankfurt | €720 | €195 | 95 | Premium, 18-month wait | | Amsterdam | €680 | €185 | 88 | Centre moratorium | | London | €760 | €215 | 105 | Expensive energy | | Paris | €650 | €175 | 78 | Nuclear = stability | | Marseille | €520 | €138 | 75 | Intercontinental cables | | Madrid | €480 | €125 | 60 | Solar available | | Milan | €510 | €132 | 82 | Growing hub | | Stockholm | €420 | €108 | 38 | PUE 1.1 | | Warsaw | €380 | €95 | 65 | Emerging |
The hidden cost: energy
Over a 7-year cycle, energy is 55–65% of colocation TCO. A Voltarione PPA at -€25/MWh saves over 7 years for 1 MW: €1.52M.
Recommendation by profile
- European latency-critical: Paris or Frankfurt + Voltarione France/Germany PPA
- AI training, non latency-bound: Stockholm or Madrid + solar/hydro PPA
- Multi-zone backup: Marseille + Madrid + Warsaw triangle inside ENTSO-E
Continue reading
Electricity surplus for data centers in Europe: the market about to redefine digital energy access
100 TWh today, 236 TWh by 2035: why European renewable surplus is the natural answer to data center energy hunger, and how Voltarione connects the two directly.
PPA (Power Purchase Agreement): the complete 2026 guide
Everything about long-term electricity purchase contracts between producers and data centers: structure, pricing, duration and risks.
Electricity surplus in Europe: the opportunity for data centers
Europe wastes more than 80 TWh of renewable electricity every year for lack of local buyers. Here is why data centers are the answer.